Fabrication of piping and shop construction of modular units saves time and money on all projects. Player and Company has the resources and facilities to accomplish this, as shown here.

LNG Loading/unloading Skid fabricated in player's shop including cryogenic piping,  insulation, electrical and controls. All systems tested prior to delivery to job site.

LNG Loading/unloading Skid fabricated in player’s shop including cryogenic piping,
insulation, electrical and controls. All systems tested prior to delivery to job site.

 

We typically design, construct, test and operate skid units prior to shipping, including electrical, controls and insulation. Fabricated piping is pressure tested and all NDT testing is completed in the shop.

Pipe fabrication in the shop allows work to progress off site at the same time as on site work and allows modular units to be installed in the field saving time and money for the client. Piping can be shop fabricated using latest cutting and welding technology, NDT tested and pressure tested prior to shipment.

Pipe fabrication in the shop allows work to progress off site at the same time as on site work and allows modular units to be installed in the field saving time and money for the client. Piping can be shop fabricated using latest cutting and welding technology, NDT tested and pressure tested prior to shipment.

 

  • Shop Fab 3
  • Shop Fab 2
  • Shop Fabrication
  • Shop Fab 4
  • natural-gas-facilities1
  • natural-gas-facilities2