Compressed-Natural-Gas-StationsPlayer and Company was the prime contractor for a natural gas compression plant installation for an existing LNG facility. The new system collected boil off natural gas from the liquefied natural gas storage for compression and introduction back into the system.

The project included all site development, building erection, piping, equipment erection, concrete foundations, electrical and controls. All was performed by Player’s own forces.