Player and Company has constructed and installed the prime power system for a new 1300 room hotel near Montego Bay, Jamaica. The plant was needed because Jamaica’s power company could not provide adequate power to meet the demands of the new resort.
The system consists of three 1.25-megawatt generators and one 1.85-megawatt back-up generator for use in a storm catastrophe or other emergency. A storage capacity for 90,000 gallons of diesel fuel will keep the plant operating for 20 days. The generators are set on spring isolators with the muffler and exhaust piping routed to the building exterior.
Each generator has:
- 150-gallon day tank
- Fuel cooler
- Exhaust fan
- Remote radiator
- Heat cover system that provides heated water to the hotel
Player and Company has constructed and installed the prime power system for a new 1300 room hotel near Montego Bay, Jamaica. The plant was needed because Jamaica’s power company could not provide adequate power to meet the demands of the new resort.
The system consists of three 1.25-megawatt generators and one 1.85-megawatt back-up generator for use in a storm catastrophe or other emergency. A storage capacity for 90,000 gallons of diesel fuel will keep the plant operating for 20 days. The generators are set on spring isolators with the muffler and exhaust piping routed to the building exterior.
Each generator has:
- 150-gallon day tank
- Fuel cooler
- Exhaust fan
- Remote radiator
- Heat cover system that provides heated water to the hotel